PERMIT NO:  24-2553
ON-LINE PERMIT
   CLERMONT
   City Hall 685 W. Montrose St., FL 34711

Schedule inspections through the online system. if you have any problems email us at inspection@clermontfl.org




PERMIT TYPE
  RESIDENTAL ALTERATION

PERMIT SUB-TYPE
    

JOB VALUE     80000
APN     2795433
DESCRIPTION
    INTERIOR REMODEL (NEW LAYOUT, EXTERIOR WALL REPLACEMENT, REW
APPLIED DATE
6/5/2024

APPROVED DATE
7/12/2024

ISSUED DATE
7/12/2024
 
Seal    
 
    PERMIT INFORMATION
FEE SUMMARY
    SITE 2285 S LAKESHORE DR
CLERMONT, FL 34711

    APPLICANT ARIAS MARIA & JORGE M MONTOYA
2285 S LAKESHORE DR
CLERMONT FL 34711

    OWNER ARIAS MARIA & JORGE M MONTOYA
2285 S LAKESHORE DR
CLERMONT FL 34711

    CONTRACTOR OWNER/BUILDER

PRE POWER 01/28/2025 AZ$105.00
RESIDENTIAL ALTERATIONS/RENOVATIONS$976.60
ZONING CLEARANCE$45.00
STATE ADMIN AND INSPEC$25.64
STATE SURCHARGE$17.09
ELECTRICAL PERMIT FEES SQ FT$244.15
PLUMBING PERMIT FEES$244.15
MECHANICAL PERMIT FEES$244.15
Total Fees Charged:$1,901.78
WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT F.S. 713.135




:


DATE    ____________
INSPECTION SUMMARY

______  NOTICE OF COMMENCEME
______  LINTEL
______  FOOTER/FOUNDATION
______  SHEATHING-WALL NAIL
______  ELECTRIC ROUGH
______  ROUGH MECHANICAL
______  ROUGH MECHANICAL
______  MECHANICAL FINAL
______  UNDERGROUND PLUMBING
______  UNDERGROUND PLUMBING
______  ROUGH PLUMBING
______  ROUGH PLUMBING
______  UNDERGROUND PLUMBING
______  2ND ROUGH PLUMBING
______  FRAMING
______  WINDOW DOOR BUCK
______  FRAMING
______  ROUGH PLUMBING
______  ROUGH PLUMBING
______  FRAMING
______  WINDOW DOOR BUCK
______  WINDOW DOOR BUCK
______  FRAMING
______  LATH
______  INSULATION FINAL
______  PRE POWER
______  PRE POWER
______  MECHANICAL FINAL
______  ROUGH GAS
______  FINAL GAS
______  MECHANICAL FINAL
______  ELECTRIC FINAL
______  FINAL GAS
______  ELECTRIC FINAL
______  MECHANICAL FINAL
______  FINAL BUILDING **
______  BLOWER DOOR TEST REPORT
______  CONSULTATION-BLDG
______  FINAL BUILDING
______  IN PROGRESS
______  INSULATION ROUGH
______  MONO SLAB
______  PLUMBING FINAL
______  PRE CONSTRUCTION MEETING-BLDG
______  PRE SLAB INSPECTION
______  STRAPPING/DOOR BUCK
______  UNDERGROUND ELECTRIC
______  WINDOW/DOOR
______  LINTEL
______  FOOTER/FOUNDATION
______  ELECTRIC ROUGH
______  UNDERGROUND PLUMBING
______  2ND ROUGH PLUMBING
______  ROUGH GAS
______  MECHANICAL FINAL
______  ELECTRIC FINAL
______  FINAL GAS