______ FOOTING ELECTRIC BONDING |
______ FOOTER/FOUNDATION |
______ FOOTING ELECTRIC BONDING |
______ FOOTER/FOUNDATION |
______ STEM WALL FILL |
______ UNDERGROUND PLUMBING |
______ FOOTER/FOUNDATION |
______ UNDERGROUND ELECTRIC |
______ SLAB |
______ MASONRY WALL |
______ SLAB |
______ MASONRY WALL |
______ ROOF DECKING (COMM) |
______ IN PROGRESS-EXT WALL COVERING |
______ ELECTRIC ROUGH |
______ ROUGH MECHANICAL |
______ IN PROGRESS-EXT WALL COVERING |
______ IN PROGRESS-EXTERIOR VENEER |
______ FIRE CONSULTATION |
______ PUBLIC WORKS (COMM) |
______ LANDSCAPING (COMM) |
______ FIRE FINAL |
______ FIRE-ABOVE CEILING |
______ DUCT WRAP |
______ MECHANICAL FINAL |
______ FIRE PENETRATION |
______ 2ND ROUGH PLUMBING |
______ ABOVE CEILING |
______ BLOWER DOOR TEST REPORT |
______ BUILIDING-LIFE SAFETY |
______ DRYWALL |
______ DUCT WRAP |
______ EIFS |
______ ELECTRIC FINAL |
______ FINAL BUILDING |
______ FINAL GAS |
______ FIREWALL 1ST LAYER-BLDG |
______ FIREWALL 2ND LAYER-BLDG |
______ FIREWALL PENETRATION-BLDG |
______ FORM BOARD SURVEY |
______ FRAMING |
______ IN PROGRESS-SOFFIT COVERING |
______ INSULATION FINAL |
______ INSULATION ROUGH |
______ KITCHEN HOOD CONTAIN-BLDG |
______ KITCHEN HOOD LIGHT-BLDG |
______ KITCHEN HOOD SMK TST BLDG |
______ KITCHEN HOOD-BLDG |
______ LATH |
______ LINTEL |
______ LOW VOLTAGE FINAL |
______ LOW VOLTAGE ROUGH |
______ MECHANICAL FINAL |
______ METER INSTALL-PUBLIC SVS |
______ OPEN TRENCH PL/EL |
______ PLUMBING FINAL |
______ RATED DRYWALL |
______ ROOF DRY-IN/FLASHING |
______ ROOF FINAL |
______ ROOF SECONDARY BARRI |
______ ROUGH GAS |
______ ROUGH MECHANICAL |
______ SEWER (BLDG) |
______ SLAB ELECTRIC BONDING |
______ STRAPPING/DOOR BUCK |
______ TERMITE CERTIFICATE |
______ UNDER/ABOVE WTR STR |
______ WINDOW/DOOR |
______ ROUGH PLUMBING |
______ NOTICE OF COMMENCEME |
______ ROOF DECKING (COMM) |
______ ELECTRIC ROUGH |
______ ROUGH MECHANICAL |
______ IN PROGRESS-EXT WALL COVERING |
______ COLUMNS INSPECTIONS |